Veteran's Memorial Bridge
US27 over St. Mary's River
INDOT - Fort Wayne District
Fort Wayne, IN
- Signature structure carrying vehicular traffic out of downtown Fort Wayne
- Deck replacement with barrier separated, widened sidewalks
- Numerous architectural features including: artwork commemorating the branches of the armed forces, arches spanning the roadway and sidewalks, and custom LED lighting
- Memorial plaza with custom signage and "The Beacon" centerpiece sculpture
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/1_DJI_0018-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2024/05/2_DJI_0003-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/3_DJI_0466-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/4_DJI_0465-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2024/05/5_1-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/6_IMG_9591-EDITED-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2024/05/7_IMG_9593-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/8_IMG_3605-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/9_IMG_3616-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/10_IMG_3618-EDITED-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2024/05/11_DJI_0017-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2024/05/12_DJI_0999-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2024/05/13_DJI_0473-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/1_DJI_0018-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2024/05/2_DJI_0003-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/3_DJI_0466-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/4_DJI_0465-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2024/05/5_1-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/6_IMG_9591-EDITED-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2024/05/7_IMG_9593-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/8_IMG_3605-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/9_IMG_3616-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/10_IMG_3618-EDITED-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2024/05/11_DJI_0017-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2024/05/12_DJI_0999-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2024/05/13_DJI_0473-EDITED.jpg?resize=810%2C487)
CR 900 N / Lafayette Center Road over Norfolk Southern Railroad
INDOT LPA Project for
Huntington County
- 120' single-span composite prestressed concrete bulb-tee beam superstructure
- Integral end bent substructure with MSE walls
- Rammed aggregate piers below MSE wall envelope
- Design included railroad coordination
- Wick drains utilized in embankments to accommodate geotechnical requirements
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2018/03/1-EDIT-5.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/2-EDIT-5.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/3-EDIT-4.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2018/03/4-EDIT-5.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/5-EDIT-1.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2018/03/1-EDIT-5.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/2-EDIT-5.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/3-EDIT-4.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2018/03/4-EDIT-5.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/5-EDIT-1.jpg?resize=810%2C487)
Van Buren Street over St. Mary's River
City of Fort Wayne
- Bridge superstructure replacement
- Prestressed concrete bulb tee beams
- USACE Floodwall modified on the northwest bank
- Decorative lighting and railing used to incorporate historical architectural theme
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2024/05/1_DJI_0783-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/2_DJI_0790-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2024/05/3_DJI_0787-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/4_P1050761-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2024/05/5_DJI_0777-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/6_DJI_0788-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2024/05/1_DJI_0783-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/2_DJI_0790-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2024/05/3_DJI_0787-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/4_P1050761-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2024/05/5_DJI_0777-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/6_DJI_0788-EDITED.jpg?resize=810%2C487)
CR 500 W over Eel River
Whitley County Bridge No. 95
- Bridge replacement project to allow for easier passage of river debris
- 3-span continuous reinforced concrete slab bridge
- Wide central span necessitated haunched supports
- Road straightened adjacent to the bridge
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2020/12/P1050518-Edit.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2020/12/P1050520-Edit.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2020/12/P1050523-Edit.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2020/12/P1050526-Crop-Edit.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2020/12/P1050518-Edit.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2020/12/P1050520-Edit.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2020/12/P1050523-Edit.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2020/12/P1050526-Crop-Edit.jpg?resize=810%2C487)
Harrison Street Bridge
City of Fort Wayne
- Bridge rehabilitation project in conjunction with construction of Fort Wayne's riverfront Promenade Park
- Sidewalks widened, providing an improved pedestrian link between the two sides of the park
- Aggregate selections for the polymeric concrete overlay were made to create three distinct surfaces
- Existing abutments converted to semi-integral, eliminating the expansion joints
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2019/08/DJI_0950-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2019/08/DJI_0952-EDIT-2.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2019/08/IMG_2859-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2019/08/DJI_0950-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2019/08/DJI_0952-EDIT-2.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2019/08/IMG_2859-EDIT.jpg?resize=810%2C487)
South Anthony Blvd.
over Maumee River
Allen County Bridge No. 363
- Superstructure replacement and deck widening to accommodate pedestrians and bicycles
- Decorative lighting and railing used to incorporate historical architectural theme
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2018/03/1-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2018/03/2-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2018/03/3-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/4-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2018/03/5-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2018/03/6-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/7-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2018/03/1-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2018/03/2-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2018/03/3-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/4-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2018/03/5-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2018/03/6-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/7-EDIT.jpg?resize=810%2C487)
Grove Street over
Spy Run Creek
Allen County Bridge No. 548
- Bridge rehabilitation
- Existing piles were reused
- New end bents and prestressed bulb-tee superstructure were constructed
- Site constraints, such as existing flag stone wall and adjacent intersection, were integrated into design
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2018/03/1-EDIT-4.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2018/03/2-EDIT-4.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2018/03/3-EDIT-3.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2018/03/4-EDIT-4.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2018/03/1-EDIT-4.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2018/03/2-EDIT-4.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2018/03/3-EDIT-3.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2018/03/4-EDIT-4.jpg?resize=810%2C487)
Johnny Appleseed Memorial Bridge
INDOT LPA Project for
City of Fort Wayne
- Part of the River Greenway Trail System
- Sidewalk widening
- Custom handrail design
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2017/02/1-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2017/02/2-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2017/02/3-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2017/02/4-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2017/02/5-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2017/02/1-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2017/02/2-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2017/02/3-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2017/02/4-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2017/02/5-EDIT-RESIZE.jpg?resize=810%2C487)
Old Lima Road over Willow Creek
Allen County Bridge No. 52
- Bridge replacement project
- 3-span continuous reinforced concrete slab bridge
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2017/02/1-EDIT-1.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2017/02/2-EDIT-1.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2017/02/3-EDIT-1.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2017/02/4-EDIT-1.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2017/02/5-EDIT-1.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2017/02/6-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2017/02/1-EDIT-1.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2017/02/2-EDIT-1.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2017/02/3-EDIT-1.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2017/02/4-EDIT-1.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2017/02/5-EDIT-1.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2017/02/6-EDIT.jpg?resize=810%2C487)
Lincoln Way Road over Eel River
Whitley County Bridge No. 18
- Bridge rehabilitation project
- Portions of existing abutment reused and converted to semi-integral
- Deck and superstructure replaced with composite prestressed concrete bulb-tee beams
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2018/03/1-EDIT-9.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/2-EDIT-9.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2018/03/3-EDIT-8.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2018/03/1-EDIT-9.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/2-EDIT-9.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2018/03/3-EDIT-8.jpg?resize=810%2C487)
CR 600 E over
Solon Ditch
Whitley County Bridge No. 68
- Bridge replacement project
- 3-span continuous reinforced concrete slab bridge
- Unique flared slab was detailed to accommodate adjacent intersection
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2018/03/1-EDIT-10.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2018/03/2-EDIT-10.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2018/03/3-EDIT-9.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2018/03/1-EDIT-10.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2018/03/2-EDIT-10.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2018/03/3-EDIT-9.jpg?resize=810%2C487)
Fish Hatchery Road over Shriner Lake
Whitley County Bridge No. 109
- Bridge replacement project
- Single-span reinforced concrete slab bridge
- Cast-in-place concrete lake control spillway integrated into wingwall design
- Design of lake level control structure was coordinated with DNR
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/1-EDIT-11.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2018/03/2-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/3-EDIT-RESIZE-1.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/1-EDIT-11.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2018/03/2-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/3-EDIT-RESIZE-1.jpg?resize=810%2C487)
County Road 59 over Soloman Shank Ditch
Dekalb County Bridge No. 60
- Bridge replacement project
- 3-span continuous reinforced concrete slab bridge
- Reinforced concrete hammerhead piers
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/1-EDIT-7.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2018/03/2-EDIT-7.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2018/03/3-EDIT-6.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2018/03/4-EDIT-7.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/5-EDIT-3.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2018/03/6-EDIT-3.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/1-EDIT-7.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2018/03/2-EDIT-7.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2018/03/3-EDIT-6.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2018/03/4-EDIT-7.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/5-EDIT-3.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2018/03/6-EDIT-3.jpg?resize=810%2C487)
Old State Road 327 over Black Creek
Dekalb County Bridge No. 103
- Bridge replacement project
- 3-span continuous reinforced concrete slab bridge
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/1-EDIT-8.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/2-EDIT-8.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2018/03/3-EDIT-7.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2018/03/4-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/5-EDIT-4.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2018/03/6-EDIT-4.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2018/03/DSCN2971-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/1-EDIT-8.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/2-EDIT-8.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2018/03/3-EDIT-7.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2018/03/4-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/5-EDIT-4.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2018/03/6-EDIT-4.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2018/03/DSCN2971-EDIT.jpg?resize=810%2C487)
View More