We have experience to make your project a success. After 20 years, our project list is extensive. Please select an area of interest.
![page-angle](http://eri.consulting/wp-content/themes/eresources/img/page-angle.png)
Projects
Veteran's Memorial Bridge
US27 over St. Mary's River
INDOT - Fort Wayne District
Fort Wayne, IN
- Signature structure carrying vehicular traffic out of downtown Fort Wayne
- Deck replacement with barrier separated, widened sidewalks
- Numerous architectural features including: artwork commemorating the branches of the armed forces, arches spanning the roadway and sidewalks, and custom LED lighting
- Memorial plaza with custom signage and "The Beacon" centerpiece sculpture
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/1_DJI_0018-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2024/05/2_DJI_0003-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/3_DJI_0466-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/4_DJI_0465-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2024/05/5_1-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/6_IMG_9591-EDITED-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2024/05/7_IMG_9593-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/8_IMG_3605-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/9_IMG_3616-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/10_IMG_3618-EDITED-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2024/05/11_DJI_0017-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2024/05/12_DJI_0999-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2024/05/13_DJI_0473-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/1_DJI_0018-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2024/05/2_DJI_0003-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/3_DJI_0466-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/4_DJI_0465-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2024/05/5_1-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/6_IMG_9591-EDITED-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2024/05/7_IMG_9593-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/8_IMG_3605-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/9_IMG_3616-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/10_IMG_3618-EDITED-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2024/05/11_DJI_0017-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2024/05/12_DJI_0999-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2024/05/13_DJI_0473-EDITED.jpg?resize=810%2C487)
Hillegas Road over US30/US33
INDOT - Fort Wayne District
- 3 - 72 ft spans using
composite prestressed
concrete bulb-tee beams - Increased underclearance to US30/US33 by 2.5 ft
- Eliminated southern span by utilizing MSE wall
- Traffic was maintained on US30/US33 throughout project
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2019/01/DJI_0998-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2019/01/DJI_0988-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2019/01/P1040611-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2019/01/P1040621-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2019/01/P1040629-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2019/01/P1040633-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2019/01/DJI_0998-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2019/01/DJI_0988-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2019/01/P1040611-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2019/01/P1040621-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2019/01/P1040629-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2019/01/P1040633-EDITED.jpg?resize=810%2C487)
CR 900 N / Lafayette Center Road over Norfolk Southern Railroad
INDOT LPA Project for
Huntington County
- 120' single-span composite prestressed concrete bulb-tee beam superstructure
- Integral end bent substructure with MSE walls
- Rammed aggregate piers below MSE wall envelope
- Design included railroad coordination
- Wick drains utilized in embankments to accommodate geotechnical requirements
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2018/03/1-EDIT-5.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/2-EDIT-5.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/3-EDIT-4.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2018/03/4-EDIT-5.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/5-EDIT-1.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2018/03/1-EDIT-5.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/2-EDIT-5.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/3-EDIT-4.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2018/03/4-EDIT-5.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/5-EDIT-1.jpg?resize=810%2C487)
I-69 & Coldwater Road Interchange
INDOT - Fort Wayne District
- Multiple projects at the I-69 & Coldwater Road Interchange in Fort Wayne
- Bridge Replacement, Two Bridge Deck Overlays
- HMA Overlay & Interchange Modification
- Maintenance of Traffic utilizes a combination of lane shifts, closures (with full ramp closure), runarounds, crossovers, and a temporary signal
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/1_DJI_0432-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/2_DJI_0438-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/3_DJI_0055-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/4_DJI_0058-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/5_DJI_0050-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/6_DJI_0051-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/7_DJI_0439-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/8_DJI_0446-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/9_DJI_0452-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/10_DJI_0445-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/11_DJI_0433-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/1_DJI_0432-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/2_DJI_0438-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/3_DJI_0055-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/4_DJI_0058-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/5_DJI_0050-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/6_DJI_0051-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/7_DJI_0439-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/8_DJI_0446-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/9_DJI_0452-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/10_DJI_0445-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/11_DJI_0433-EDITED.jpg?resize=810%2C487)
I-469 Over Lafayette Center Road
INDOT - Fort Wayne District
- Bridge Superstructure Replacement
- Phased Interstate Maintenance of Traffic utilizing crossovers
- Prestressed concrete bulb tee beams
- Clear deck forms
- NExT concrete sensor technology in the deck
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/1_DJI_0914-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/2_DJI_0902-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/3_IMG_0360-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/4_IMG_2100-EDITED-scaled.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/5_IMG_2117-EDITED-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2024/05/6_DJI_0025-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/7_DJI_0655-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/1_DJI_0914-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/2_DJI_0902-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/3_IMG_0360-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/4_IMG_2100-EDITED-scaled.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/5_IMG_2117-EDITED-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2024/05/6_DJI_0025-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/7_DJI_0655-EDITED.jpg?resize=810%2C487)
I-469 East End Bridge Deck Overlays
INDOT - Fort Wayne District
- Rigid bridge deck overlays and semi-integral end bent conversions on 7 bridges in the Fort Wayne District
- Phased Interstate Maintenance of Traffic utilizing crossovers
- I-469 over Maumee River, I-469 over Norfolk Southern Railroad, I-469 over Dawkins Road, & Stellhorn Road over I-469
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/1_DJI_0672-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2024/05/2_DJI_0686-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2024/05/3_DJI_0057-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/4_DJI_0675-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/5_DJI_0036-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2024/05/6_DJI_0717-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/7_DJI_0718-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/1_DJI_0672-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2024/05/2_DJI_0686-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2024/05/3_DJI_0057-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/4_DJI_0675-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/5_DJI_0036-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2024/05/6_DJI_0717-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/7_DJI_0718-EDITED.jpg?resize=810%2C487)
I-69 Over Walnut Creek
INDOT - Fort Wayne District
- Superstructure replacement on I-69
- Maintenance of Traffic utilized runaround with the use of a prefabricated temporary steel truss structure in the median
- Temporary causeway installed for placement of scour countermeasures
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/1_DJI_0817-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2024/05/2_DJI_0819-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/3_DJI_0040-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/4_DJI_0037-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/5_DJI_0036-EDITED-1.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/6_DJI_0820-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/1_DJI_0817-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2024/05/2_DJI_0819-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/3_DJI_0040-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/4_DJI_0037-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/5_DJI_0036-EDITED-1.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/6_DJI_0820-EDITED.jpg?resize=810%2C487)
US 6 Over Turkey Creek
INDOT - Fort Wayne District
- Bridge Deck Overlay on US6 over Turkey Creek
- Temporary signal utilized to maintain traffic during construction
- Temporary causeway installed to place scour countermeasures
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/1_DJI_0758-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2024/05/2_DJI_0089-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/3_DJI_0085-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/4_DJI_0073-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/5_DJI_0071-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2024/05/6_DJI_0939-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/7_DJI_0951-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/1_DJI_0758-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2024/05/2_DJI_0089-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/3_DJI_0085-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2024/05/4_DJI_0073-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/5_DJI_0071-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2024/05/6_DJI_0939-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2024/05/7_DJI_0951-EDITED.jpg?resize=810%2C487)
Yoder Road over I-69
- Design-build bridge rehabilitation project through INDOT
- Partial replacement of superstructure and substructure with full deck replacement
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2018/03/1-EDIT-2.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2018/03/2-EDIT-2.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/3-EDIT-1.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2018/03/4-EDIT-2.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2018/03/5-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2018/03/6-EDIT-1.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/7-EDIT-1.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2018/03/8-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2018/03/1-EDIT-2.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2018/03/2-EDIT-2.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/3-EDIT-1.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2018/03/4-EDIT-2.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2018/03/5-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2018/03/6-EDIT-1.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/7-EDIT-1.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2018/03/8-EDIT.jpg?resize=810%2C487)
Johnny Appleseed Memorial Bridge
INDOT LPA Project for
City of Fort Wayne
- Part of the River Greenway Trail System
- Sidewalk widening
- Custom handrail design
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2017/02/1-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2017/02/2-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2017/02/3-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2017/02/4-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2017/02/5-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2017/02/1-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2017/02/2-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2017/02/3-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2017/02/4-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2017/02/5-EDIT-RESIZE.jpg?resize=810%2C487)
US 35 over Long Branch Creek
INDOT - Fort Wayne District
- Small structure replacement
and extension of two-way
left turn lane on heavily
traveled US 35 - Cast-in-place wingwalls minimized structure length and reduced environmental impacts
- Phased construction utilized temporary traffic signals and temporary shoring
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2018/03/1-EDIT-1.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/2-EDIT-1.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2018/03/3-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2018/03/4-EDIT-1.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2018/03/1-EDIT-1.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/2-EDIT-1.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2018/03/3-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2018/03/4-EDIT-1.jpg?resize=810%2C487)
Huntington County Roads over I-69
INDOT - Fort Wayne District
- CR 200 S, CR 300 E/CR 400 S, CR 900 S, and CR 1000 S over I-69 in Huntington County
- Hydrodemolition and installation of latex modified or microsilica concrete bridge deck overlays
- Drainage improvements adjacent to bridge end bents
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2018/03/1-EDIT-3.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2018/03/2-EDIT-3.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/3-EDIT-2.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/4-EDIT-3.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2018/03/1-EDIT-3.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2018/03/2-EDIT-3.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/3-EDIT-2.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/4-EDIT-3.jpg?resize=810%2C487)
SR 114 over branch of Calf Creek
INDOT - Fort Wayne District
- Small structure replacement project
- Custom designed grated box end sections
- Reduced construction cost and eliminated need for guardrail
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/1-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2018/03/2-EDIT-RESIZE-1.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2018/03/3-EDIT-RESIZE-2.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/4-EDIT-RESIZE-1.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/1-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/eri.consulting/wp-content/uploads/2018/03/2-EDIT-RESIZE-1.jpg?resize=810%2C487)
![](https://i1.wp.com/eri.consulting/wp-content/uploads/2018/03/3-EDIT-RESIZE-2.jpg?resize=810%2C487)
![](https://i2.wp.com/eri.consulting/wp-content/uploads/2018/03/4-EDIT-RESIZE-1.jpg?resize=810%2C487)
View More