The Pearl
Fort Wayne, IN
- 2 levels of post-tensioned concrete for the podium structure with staged stressing of tendons
- 5 levels of load bearing cold formed steel walls above the podium with composite open web steel joists
- Elevated parking deck on the first level of post-tensioned concrete (flat slab construction)
- Post-tensioned transfer beams above the first level event space and commercial spaces
- Laterally supported by concrete shear walls
- $65 million construction cost – mixed use development